East Texas Medical Center
Pittsburg, Texas
Owner: / General Contractor: / Contract Amount: Integris Southwest
Oklahoma City, Oklahoma Medical Center of Southeast Oklahoma
Durant, Oklahoma Sigma Meats
Seminole, Oklahoma Titus Regional Medical Center
Mt. Pleasant, Texas TRMC Wellness Center / Titus Multipurpose Center
Mt. Pleasant, Texas
Owner: Titus Medical Center / General Contractor: FJW Group / Contract Amount:
The East Texas Medical Center Healthcare System Pittsburg Hospital consists of a 99,000 square foot single story structure. This is a replacement hospital for an existing community facility located within the city limits of Pittsburg. In order to serve the community in the future the new hospital is designed both mechanically and in structural characteristics to support a second floor. The present foot print will facilitate twenty-five private patient rooms. Expansion capabilities will double this capacity. The hospital facility offers two operating suites and a magnetic resonance imaging suite. Ivey Mechanical worked closely with the ETMC staff in early purchasing stages to accommodate their HVAC and plumbing needs which included two McQuay “frictionless” magnetic bearing hermetic centrifugal chillers. Owner: Integris Health / General Contractor: Robins & Morton / Contract Amount: $3.3 Million
Ivey began this project in July 2007 and completed it in April 2009. The project consisted of six phases that extended over 21 months. The first phase was 26,000 square feet of new addition. The remaining five phases were renovations to the existing hospital which totaled approximately 34,000 square feet. Ivey added two new operating rooms in phase one and renovated seven existing OR's during the remodel. Each OR included a new smoke evacuation system. Two new air handling units were added into a new penthouse, and one new rooftop unit was added. This project presented difficult scheduling measures due to the phasing of the work. With good planning and scheduling, Ivey completed this project on time and under budget. Owner: Health Management Associates / General Contractor: M.J. Harris / Contract Amount: $2.3 Million
Ivey Mechanical completed construction on the renovations and new construction of this project in June 2009. Ivey, working with MJ Harris General Contractors completed phased renovations on the first and second floors of the hospital’s 5,984 square foot endoscopy and operating rooms, 4,308 square foot renovation of the progressive care center. Following the renovations of the existing facility, Ivey completed a new three story, 13,232 square foot 20 bed expansion, attached to and built on opposite ends of the existing Hospital. Ivey installed four new suspended air handling units in the new expansion, and performed numerous medical gas shutdowns during connections to the existing systems, without interruption to the hospital’s patient care, proving that Ivey Mechanical are “People you can Rely On”. Owner: Sigma Meats / General Contractor: The Stellar Group / Contract Amount: $5 Million
Ivey completed construction of this 130,000 square foot meat processing plant in April 2008. Ivey provided all mechanical and plumbing construction. The Oklahoma plant produces Mexican-style hams, cold cuts and hot dogs. To prevent cross-contamination, the facility features separate raw (located downstairs) and ready-to-eat areas (located upstairs), as well as separate entrances and welfare areas. The plant includes administrative offices with training rooms, a raw material receiving dock, finished docks, a U.S.D.A. inspection office, a separate utility mezzanine and features an Armor Inox Thermix system, a fully automated, advanced water cook, cool and chill system for hams.The plant also includes maintenance, packing, dry storage and refrigerated make-up areas. The facility’s walls and ceiling are constructed of pre-cast insulated metal panels, and the floor consists of concrete and epoxy toppings. Owner: Titus Regional Medical Center / General Contractor: FJW Group / Contract Amount: $1.5 Million
Ivey will complete construction on this 20,000 square foot expansion and 40,000 square foot addition in September, 2009. This project included new additions of a second and third floor for new administrative offices, endoscopy suite, and laboratory. Ivey Mechanical, working with FJW Group General Contractors, removed and installed a new chiller, cooling tower, relocated five existing roof top air handling units, and three new roof top units, including a new operating room unit, without interrupting services to the existing Hospital. As the new structure was being built over the existing units, Ivey Mechanical installed the new Heating and Chilled water piping and installed temporary ductwork in preparation for the unit change out. Once all the systems were in place, Ivey relocated the existing units to the new roof overnight, and had them back on line for the Owner by the start of business the next day. Ivey Mechanical completed construction on this 63,874 square foot new construction in March, 2009. The project consisted of a Wellness and Fitness Center, and a new Exercise and Therapy pool on the first floor. Doctors lease spaces, a new Breast Center, and a Conference Center were added to the project during construction. Ivey Mechanical, working with the FJW Group General Contractors, installed four new Roof Top Air Handling Units, and a suspended Dehumidification Unit for the Pool Areas. This new facility is located on the Titus Regional Medical Center’s campus in Mt. Pleasant, Texas, and is the Hospital’s main center for patient rehabilitation.
East Texas Medical Center
Pittsburg, Texas
Owner: / General Contractor: / Contract Amount:
The East Texas Medical Center Healthcare System Pittsburg Hospital consists of a 99,000 square foot single story structure. This is a replacement hospital for an existing community facility located within the city limits of Pittsburg. In order to serve the community in the future the new hospital is designed both mechanically and in structural characteristics to support a second floor. The present foot print will facilitate twenty-five private patient rooms. Expansion capabilities will double this capacity. The hospital facility offers two operating suites and a magnetic resonance imaging suite. Ivey Mechanical worked closely with the ETMC staff in early purchasing stages to accommodate their HVAC and plumbing needs which included two McQuay “frictionless” magnetic bearing hermetic centrifugal chillers.
|
|